BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P1H
REFRESH-INTERVAL:P1H
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=2SU
DTSTART:20070101T000000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:Central Daylight Time
END:DAYLIGHT
BEGIN:STANDARD
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
DTSTART:20070101T000000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:Central Standard Time
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20201222T080000
DTEND;TZID=America/Chicago:20201222T100000
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:IECC Energy Efficiency Air Barrier Requirements for New Construction
DESCRIPTION:Building permit offices are starting to require a 3rd party inspection of insulation/thermal barrier through blower door performance or visual inspection. This class overviews the requirements of visual inspection\, what it encompasses\, what it cost\, pros and cons\, and comparing blower door vs. visual inspection. Worth 2.0 CEUsPresented by our Bronze Industry Partner Baum Environmental Group\nState code amendment Section N1102.4.2.1 Testing options: (this is the state code requiring either blower door or visual testing) Tested air leakage is less than 7 ACH when tested with a blower door at a pressure of 50 pascals (0.007 psi). Testing shall occur after rough in and after installation of penetrations of the building envelope\, including penetrations for utilities\, plumbing\, electrical\, ventilation and combustion appliances. When the contractor\, design professional or homeowner chooses the blower door testing option\, blower door testing shall be performed by individuals certified to perform blower door tests by a nationally recognized organization that trains and provides certification exams for the proper procedures to perform such tests. The responsible BCEO shall accept written blower door test reports from these certified individuals to verify the minimum requirements of Section N1102.4.2.1 Testing Option are attained.N1102.4.2.2 Visual Inspection Option.  The items listed in Table N1102.4.2\, applicable to the method of construction \, are field verified.  Where required by the code official\, an approved party independent from the installer of the insulation\, shall inspect the air barrier and insulation.
X-ALT-DESC;FMTTYPE=text/html:<!DOCTYPE html><html><head><title></title></head><body aria-disabled="false"><p>Building permit offices are starting to require a 3rd party inspection of insulation/thermal barrier through blower door performance or visual inspection. This class overviews the requirements of visual inspection\, what it encompasses\, what it cost\, pros and cons\, and comparing blower door vs. visual inspection. <strong fr-original-style="" style="font-weight: 700\;">Worth 2.0 CEUs</strong></p><p>Presented by our Bronze Industry Partner <a fr-original-style="" href="https://www.baumenvironmentalgroup.com/" style="user-select: auto\;">Baum Environmental Group</a></p><p><br></p><p><u>State code amendment </u></p><p>Section N1102.4.2.1 Testing options: (<strong fr-original-style="" style="font-weight: 700\;">this is the state code requiring either blower door or visual testing</strong>) Tested air leakage is less than 7 ACH when tested with a blower door at a pressure of 50 pascals (0.007 psi). Testing shall occur after rough in and after installation of penetrations of the building envelope\, including penetrations for utilities\, plumbing\, electrical\, ventilation and combustion appliances. When the contractor\, design professional or homeowner chooses the blower door testing option\, blower door testing shall be performed by individuals certified to perform blower door tests by a nationally recognized organization that trains and provides certification exams for the proper procedures to perform such tests. The responsible BCEO shall accept written blower door test reports from these certified individuals to verify the minimum requirements of Section N1102.4.2.1 Testing Option are attained.</p><p>N1102.4.2.2 Visual Inspection Option. &nbsp\;The items listed in Table N1102.4.2\, applicable to the method of construction \, are field verified. &nbsp\;Where required by the code official\, an approved party independent from the installer of the insulation\, shall inspect the air barrier and insulation.</p></body></html>
LOCATION:
UID:e.766.310482
SEQUENCE:3
DTSTAMP:20260404T233309Z
URL:https://hbagbr.growthzoneapp.com/maincalendar/Details/iecc-energy-efficiency-air-barrier-requirements-for-new-construction-291713?sourceTypeId=Hub
END:VEVENT
END:VCALENDAR
